Utility Regulator
Últimos documentos
- Ballylumford – Eden 110kV Double Circuit Overhead Line Refurbishment: Construction Allowance Determination
- Extension to issuing a connection offer – Rigged Hill Windfarm
The Utility Regulator has granted NIE Networks an extension until 30 August 2022 to issue a connection offer for Rigged Hill Windfarm. Condition 30 of NIE Network’s Distribution Licence states that (barring specified exceptions) NIE Networks is obliged to make an offer for connection to the distribution system as soon as practicable and in any event within three months from receipt of a valid/completed application for connection. The Utility Regulator has the powers to provide a consent for extensions to this time period under the same Condition. Following review and full consideration of NIE Networks’ extension request regarding Rigged Hill Windfarm, the Utility Regulator has provided consent to grant an extension to issuing an offer as soon as practicable but no later that 30 August 2022.
- Micro-Generation Settlement Decision Paper
- SONI Licence Condition 16 – Grid Code Modification Determination (FERA)
- SONI Licence Condition 16 – Grid Code Modification Determination (DRAI)
- RP7 approach document
- Proposed approach to Best practice framework programme
- Extension to issuing a connection offer – Cullion Windfarm
The Utility Regulator has granted NIE Networks an extension until 12 October 2022 to issue a connection offer for Cullion Windfarm. Condition 30 of NIE Network’s Distribution Licence states that (barring specified exceptions) NIE Networks is obliged to make an offer for connection to the distribution system as soon as practicable and in any event within three months from receipt of a valid/completed application for connection. The Utility Regulator has the powers to provide a consent for extensions to this time period under the same Condition. Following review and full consideration of NIE Networks’ extension request regarding Cullion Windfarm, the Utility Regulator has provided consent to grant an extension to issuing an offer as soon as practicable but no later than 12 October 2022.
- GT22 Annex 5 Post Efficiency allowances
- GT22 Annex 4 Consultation responses
Documentos destacados
- MP NI 18 Special Read V 3.0
- MP NI 20 - Change of SSAC and/or Supplier Unit V 3.0
- MP NI 24 Change of Customer Details v 3.0
- MP NI 25 - Change of Legal Entity v 3.0
- MP NI 27 - New GroupedMPRN v 3.0
- NIEES Price Control Determination
- MP NI 29 - Change of Supplier Grouped Unmetered v 3.0
- Power NI tariff briefing paper May 2021
- MP NI 31 - Unmetered Data Processing v 3.0
- MP NI 32 - Changes of :Legal Entity Grouped Unmetered v 3.0