(1) Amaal Ventures Ltd v Eros Ltd
| Jurisdiction | England & Wales |
| Court | Chancery Division |
| Judge | Stephen Jourdan |
| Judgment Date | 17 April 2026 |
| Neutral Citation | [2026] EWHC 870 (Ch) |
| Year | 2026 |
| Docket Number | Claim No: PT-2024-000493 |
[2026] EWHC 870 (Ch)
Stephen Jourdan KC SITTING AS A JUDGE OF THE HIGH COURT
Claim No: PT-2024-000493
IN THE HIGH COURT OF JUSTICE
BUSINESS AND PROPERTY COURTS
PROPERTY TRUSTS AND PROBATE LIST (CH D)
Royal Courts of Justice, Rolls Building
Fetter Lane, London, EC4A 1NL
Representation
John McGhee KC and Jonathan Chew (instructed by Bryan Cave Leighton Paisner LLP) for the Claimants
Jonathan Seitler KC and James McCreath (instructed by PCB Byrne LLP) for the Defendant
Hearing and judgment dates
Hearing dates: 2 March (pre-reading), 3, 4, 5, 6 and 11 March 2026
Draft judgment sent to the parties on: 13 April 2026
Date of handing down of judgment: This judgment was handed down remotely at 10.30 am on Friday 17 April 2025 by circulation to the parties' representatives by e-mail, and by release to the National Archives.
Stephen Jourdan KC:
Introduction
This claim relates to contracts entered into in October 2020 for the off-plan sale of two flats in Mayfair for premiums totalling just over £10.6 million. The Claimants are the buyers. The Defendant is the seller.
On 3 August 2023, the Defendant served notices which, if valid, fixed the date for the completion of the sales as 17 August 2023. On that date, the Defendant served notices to complete. If valid, they made time of the essence for completion by Friday 1 September 2023. The Claimants did not send the completion monies to the Defendant's solicitors by that time, and on Monday 4 September 2023, the Defendant wrote saying that the contracts were terminated.
The Claimants say that the notices to fix the completion date were not valid because the seller failed to provide a structural defects insurance certificate required by the contracts. Alternatively, they say that the notices to complete were not valid, because a furniture package which formed part of the sale was not sufficiently installed in the flats. They claim specific performance. Or, if that fails, they say that the money paid by them under the contract – 30% of the purchase price – should be repaid to them. The Defendant says that the notices were valid, it validly terminated the contracts, and it is entitled to keep the payments.
The Development and the Contracts
22 Hanover Square, London, W1 was acquired in July 2014 by the Defendant, Eros Limited, a company in the Clivedale group. They proposed to redevelop the property as a combined luxury hotel and residential development, with leisure facilities and parking. Mandarin Oriental were chosen as the hotel operator. The development was given the name “Hanover Bond”. There was to be a north tower and a south tower, together containing 77 flats.
It was proposed that the Mandarin Oriental would operate a rental pool programme. If a flat was entered into that programme, the hotel would use the flat for up to 90 days per year (the maximum permitted by the planning legislation) for short term lets. Advertising material headed “Mandarin Oriental Mayfair London – Rental Pool with Furniture Pack – indicative earnings” was provided to prospective purchasers, including the Claimants. The documents gave indicative earnings of £2,600 per night (equal to £234,000 for 90 nights) for a 2 bed flat, and £3,400 per night (equal to £306,000 for 90 nights) for a 3 bed flat. In order to participate in the proposed rental programme, it was necessary for the flat to be fitted out with what was referred to as a “furniture package”. This was furniture, fixtures and equipment (“FF&E”) such as sofas, rugs and pictures, and operating supplies and equipment (“OS&E”) such as cutlery and bed linen, of a type satisfactory to the Mandarin Oriental.
On 1 October 2020, the Defendant as “Seller” entered into two contracts (“the Contracts”) for the sale of two flats in 22 Hanover Square (“the Flats”). The first contract was with the First Claimant, Amaal Ventures Limited as Buyer for the sale of a 999 year lease of flat N4.4, a 3 bed flat, for £5,961,000. The second contract was with the Second Claimant, Shievon Ventures Limited as Buyer for the sale of a 999 year lease of flat S8.1, a 2 bed flat, for £4,641,000. Those prices equated to about £4,560 per square foot for flat N4.4 and £4,716 per square foot for flat S8.1. The Contracts are in the same form insofar as is material.
Both the Claimant companies were British Virgin Island registered companies. The ultimate beneficial owner of both companies was Ashiesh Aadinatha.
In summary, under the Contracts:
(a) The Seller agreed to use all reasonable and proper endeavours within its control to procure the construction of the Flat and the development in a good and workmanlike manner and in accordance with various requirements, including those of the “Warranty Provider”, subject to necessary variations. The “Warranty Provider” was “any of the new home warranty scheme administrators referred to in the CML Lender's Handbook that the Seller may decide to appoint”.
(b) Once the Flat was substantially completed, the Seller was to serve a notice fixing the completion date – a “Completion Notice”. Clause 5.2 said that the Seller had to provide the Buyer's solicitors with copies of three documents on or before service of the Completion Notice. They were a “Certificate of Insurance”, the final building control certificate relating to the Flat and the buildings insurance schedule and policy. The Certificate of Insurance was “the certificate of insurance for the Flat issued by the Warranty Provider”.
(c) Clause 5.3 said that the Flat would be treated as substantially completed when it is ready for occupation notwithstanding the existence of any “Snagging Items”. These were “minor outstanding items or defects in the Flat or the fixtures fittings and contents thereof which do not impact on the beneficial use and enjoyment thereof”. The Buyer had the right to inspect after service of the Completion Notice and could serve a list of any Snagging Items, after which the Seller was to remedy them as soon as reasonably practical at its own cost. Also, if within 6 months after completion any Snagging Items arose, the Buyer could on two occasions notify the Seller and the Seller would then be obliged to procure that they were remedied at its own cost and in a good and workmanlike manner as soon as reasonably practical.
(d) A “Deposit” and two “Stage Payments” were payable under clause 4. The Deposit was 10% of the Price, less a non-refundable reservation fee paid before the Contract was entered into. The Deposit was payable on entering into the Contract. The First Stage Payment was 10% of the purchase price payable within 12 months of the Contract. The Second Stage Payment was also 10% of the purchase price payable within 24 months of the Contract.
(e) All three payments were to be paid to and held by the Seller's solicitors as stakeholder pending completion, or determination of the Contract. However, under clause 4.9, if the Seller was able to obtain insurance including deposit protection cover in the event of the Seller's insolvency or fraud, the part of the Deposit or Stage Payments protected by the insurance was to be released to the Seller.
(f) The “Furniture Package” was included in the sale. This was “the furniture and other chattels to be included in the sale and which are required in order for the Flat to be compliant for the purposes of the Rental Programme, an indicative schedule of which is attached at Appendix 4”. The Rental Programme was “the proposed programme for the renting of the flats within the Development to the Hotel Operator for up to 90 days a year”.
(g) If the Seller did not serve a Completion Notice prior to 31 December 2023, then either party could serve notice terminating the Contract, in which case the Deposit and Stage Payments were to be returned to the Buyer.
(h) The Standard Conditions of Sale (Fifth Edition) applied, with certain amendments.
In the Appendix to this judgment, I set out the relevant terms of the N4.4 Contract and the relevant Standard Conditions including the amendments made by the Contracts.
Appendix 4 in the case of both Contracts provided an “indicative schedule” of the Furniture Package. In both cases it was headed “The Residences – Mandarin Oriental – Mayfair London” and then said “Provisional furniture schedule. Scheme: Mo_May (2 bedroom, apartment N6.4).”
Flat S8.1 was a 2 bed flat, but flat N4.4 was a 3 bed flat, so clearly the wrong indicative schedule was attached in the case of that Contract.
There followed a long list of FF&E and OS&E, such as a sofa, pillows, artwork, clothes hangers, soap dispensers and hand lotion, and including equipment such as a coffee maker, a kettle and a hairdryer. In each case there was a description of the item, often detailed, a photo, the name of a company, a description, a description of the finish, and the quantity.
Subsequent events
The Claimants paid the Deposits and the Stage Payments for both flats, amounting to 30% of the purchase price. The Second Stage Payment for flat S8.1 however was paid late. It had been due on 1 October 2022. The Defendant agreed to defer exercise of its right to terminate for non-payment until 1 March 2023, on the basis that it was received by then with interest. Even then, it was not in fact received until mid-March 2023.
On 18 May 2023, the Defendant's then solicitors, Brecher, served a Completion Notice for flat N4.4, fixing the Completion Date as 1 June 2023. On 8 June 2023, Brecher served a Completion Notice for flat S8.1, fixing the Completion Date as 21 June 2023. Subsequently, Brecher served notices to complete. The validity of these notices was disputed, however.
On 31 July 2023, the Defendant instructed Kingsley Napley in place of Brecher. They wrote to the Claimants' solicitors saying that the Defendant was withdrawing the notices...
Get this document and AI-powered insights with a free trial of vLex and Vincent AI
Get Started for FreeStart Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial
-
Amaal Ventures Ltd v Eros Ltd
...per annum above Bank of England base rate from time to time until 4 months after the date of this order, and at the Judgments Act 1838[2026] EWHC 870 (Ch). I held that the Claimants were entitled to an order for the specific performance of contracts they had entered into with the Defendant ......