Chapter 9: Basic engineering
| Library | The Application of Contracts in Developing Offshore Oil and Gas Projects |
| Pages | 111-124 |
| Author | Philip Loots,Donald Charrett |
The basic engineering phase builds on the results of the feasibility study and is the last phase of the internal planning process. 1
The central activity is the FEED – development of the design concept in sufficient detail to provide a firm basis for detailed design and engineering. This process must of necessity limit the flexibility that would allow alterations late in the basic design. This phase provides the last chance for the Owner to alter the concept or scope radically without exposing the project to the probability of considerable delays and extra costs. At the end of this phase, the Owner usually makes the major commitment to external consultants or contractors. That in turn marks the beginning of a greatly accelerated growth in the rate of investment.
The S-curve (rate of investment) is a measure of the size of the project organisation and the way in which the deployment of manpower and materials increases as the development progresses. In the basic engineering phase the influence at first rests with the Owner and designers; as the work proceeds, the prime influence passes to the designers, and finally the execution of construction is in the hands of the Contractors. This is a conventional contract design-bid-build pattern.
Alternatively, in a D&C contract situation the product of basic engineering is a performance specification and the Owner’s influence on the details of the work is confined mainly to the early stages. Attempts to impose direct influence later on (except in a few specialised aspects) are fraught with difficulty, because the Owner is too far from the massive array of details, and too much effort is required to master them sufficiently to control the effects of changes made. Once contractual commitments have been made, it becomes much more difficult to make changes without incurring delays and extra costs.
The aims of the basic engineering phase are best described in terms of the output normally expected from it. First, in technical terms the selected option should be refined and detailed, taking account of the latest performance standards and cost criteria and thus setting a firm basis for the following phase of detailed design. Preparation of performance and requirement specifications are an intrinsic part of this process.
Secondly, the project execution plan produced in the feasibility phase should be reviewed and amplified to provide an effective guide for the remainder of the project. The revised plan should incorporate all new information being generated, including both the design and such other elements as cost and time budget plans, cash flow requirements, resources schedules and control systems.
The use of the term ‘project management’ rather than ‘project plan’ underlines the need for project management to be active from the start of this phase. The project manager should be seen to be responsible for setting up the project plan and organising the project in such a way that the basic design responds to well-defined and clear objectives, properly communicated. Time devoted to planning at this juncture is not wasted; it should avoid difficulties at later stages.
Reviews of projects that have failed in the past show lack of a detailed plan and of a project manager appointed at this stage to be common causes of poor project performance.
The first step in the basic design should be to optimise the design in accordance with the Owner’s requirements and priorities; the layouts and principal dimensions should then be established, and the performance criteria defined. 2
If the detailed design is to be undertaken by organisations which are not involved in the basic design, the work of each should be defined. The drawings, schedules and other information that will comprise the product of the basic design must be produced in a form that enables each work package to be identified. This boundary marks a formal break between the basic design and detailed design phases – it may not be so clearly visible, however, where the basic and detailed design are within the scope of one organisation.
The design organisation is determined by technical factors and by the Owner’s policy for project implementation. 3 In deciding how the design function should be packaged, established patterns for the industry concerned should preferably be followed, unless there is a real advantage in changing to meet the particular needs of the project. This course is advantageous in that the parties have a clear understanding of their obligations, responsibilities and relationships to one another.
Other technical factors to be considered include, first, that the nature of the technology concerned may show that a split between basic and detailed engineering, or between design and construction, is impracticable. Secondly, there may be only a few organisations available that are capable of carrying out the design. Thirdly, for projects requiring a range of specialised engineering inputs, there may be a choice between discrete design organisations and one with a multidisciplinary capability. The use of separate organisations has the advantage that the Owner can select those perceived to offer the best capability in each technology. However, the selection process is influenced by price competition, and many Owner organisations are structured so that cost factors may outweigh technical preference.
Splitting up the design work can often leave open the question of how and by whom the separate organisations will be coordinated. Conversely, the appointment of a single firm with a wide range of technical skills to do all the design has the advantage of unified responsibility for design and coordination. This benefit should be considered in relation to any weaknesses in the firm with respect to certain technologies and their application to the particular project. Thus, there are no definite rules; each case should be decided according to the circumstances.
Every design is a compromise between requirements that may be in mutual conflict or that cannot all be satisfied at the same time. These include product mix, technology, material flows, matching of plant items, space, layout, traffic circulation, safety, capital cost, operating cost and programmes, as well as the quality of the design. The basic design should strike the best balance between requirements – striking this balance is an interactive process called design optimisation.
The performance criteria governing the optimisation should be defined beforehand, usually in the project plan. Both the size and the priority of each requirement should be specified, so as to show, for example, which criteria are the most important ones to which others must yield in the case of a conflict. If the criteria are not clear, an experienced design team will usually submit their own proposals to fill the gaps and obtain the Owner’s approval before starting the design.
A logical sequence of optimisation should first establish performance criteria. All the design specialists should then be involved. This process requires many iterations, as well as research into some aspects, before an acceptable balance of systems, performance, capital and operating cost is achieved. Any delay in the optimisation process is likely to have an immediate effect on the construction programmes.
The optimisation stage should be based on planning and coordination of the activities, appropriate to the complexity anticipated in the design. A review of this process should consider whether or not the following features received sufficient attention:
-
A clear and concise brief which defines the design performance objectives and priorities.
-
A plan which is sequenced and allows for iteration to enable optimisation of the design with inputs from all technical specialisations.
-
The active involvement of the Owner and/or the Operator.
-
Good communications between and within all design organisations.
-
Timely availability of specialist data, e.g. selected studies, geotechnical investigations, market research.
-
Quality assurance policy and procedures.
-
Close liaison between design and the cost and planning activities so that the cost and time implications of various solutions can be evaluated as the design evolves.
-
Good reporting, which gives balanced reviews of the various solutions under consideration.
The breakdown of the detailed design into work packages should be decided in preparation for the next phase. 4 The design organisations should also contribute to the contract strategy, to which the scheduling and allocation of design tasks must be tailored. The degree of definition depends on whether the detailed design is to be performed by those undertaking the basic design, is to be open to negotiated or competitive selection, or is to form part of a design-and-construct contract. If the project is to be built to a tight programme, it may be necessary to consider an overlap between design and construction phases.
However the design is packaged, the terms of reference...
Get this document and AI-powered insights with a free trial of vLex and Vincent AI
Get Started for FreeStart Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting