Chapter 7: Shipbuilding Contracts and Risks
| Library | Modern Maritime Law |
| Pages | 221-289 |
| Author | Aleka Mandaraka-Sheppard |
In the last decade, owing to high rates in freight and hire and the ban on single-hull tankers, the shipbuilding market boomed. The shipbuilding yards, especially those of Korea and China, were flooded with new orders for the construction, in particular, of major container ships, chemical tankers and double-hull tankers. Overcapacity, and the sudden emergence of the world economic crisis in 2008, caused a disturbance in trade, a sharp drop in freight rates and, consequently, the cancellation of contracts. Disputes resulting in court or arbitration proceedings were inevitable.
Remarkable developments have also been witnessed in the last decade in relation to the quality of new shipbuilding. In 2002, at the 89th session of the IMO Council, Bahamas and Greece suggested that IMO should play a larger role in determining the standards to which new ships are built, this being traditionally the responsibility of classification societies and shipyards. The idea was that ship construction standards should permit innovation in design but, at the same time, ensure that ships are constructed in such a manner that, if properly maintained, they could remain safe for their economic life.
After extensive discussions in the Maritime Safety Committee, the Council and the IMO Assembly, the strategic plan for the GBS for ship construction became a long-term work of the MSC for six years until 2010. Unlike the prescriptive approach, ‘goal-based regulation’ does not specify the means of achieving compliance, but sets goals that allow alternative ways of achieving it. 1
These standards, which are now known as the International Goal-based Ship Construction Standards for Bulk Carriers and Oil Tankers, have been developed on the basis of a five-tier system, consisting of (1) goals (Tier I), (2) functional requirements (Tier II), (3) verification of conformity (Tier III), (4) rules and regulations for ship design and construction (Tier IV) and(5) industry practices and standards (Tier V).
It is understood that the first three tiers constitute the GBS, developed by IMO, which set the parameters of what has to be achieved, leaving the experts in ship design to decide on how best to employ their professional skills to meet the required standards. Tiers IV and V contain provisions and rules to be developed by the classification societies, other recognised organisations and industry organisations. The MSC of IMO formally adopted the GBS on 20 May 2010 along with amendments to SOLAS Chapter II-1, making their application mandatory, with an entry into force on 1 July 2012.
At the same period the classification societies, through IACS, were working on the Common Structural Rules for the building of new double-hull tankers and bulk carriers, which were adopted in 2006. There has also been a tripartite dialogue between ship-owners, shipbuilders and classification societies, through IACS, to discuss their mutual interest relating to shipbuilding standards, contractual relationships and yard capacity and to ensure that ships are fit for purpose.
Usually shipbuilding contracts provide for English law and jurisdiction. The contracts are on standard terms, for example: the contract of the Association of West Europe Shipbuilders, the contract of the Shipowners Association of Japan (SAJ), the contract of the Maritime Subsidy Board of the US Department of Maritime Administration and the contract of the Association of Norwegian Marine Yards.
Recognising that existing standard form contracts are not serving the interests of both parties equally, BIMCO launched a new Standard Newbuilding Contract, NEWBUILDCON, in 2008, to be used across the industry and help in facilitating the business process by encouraging the use of standard wording. The objective of developing this contract was to provide builders and buyers with an alternative contract to those mainly in use. The BIMCO contract offers the parties a modern, clearly worded, balanced and comprehensive shipbuilding contract, so that the parties can easily identify their rights and obligations and reduce the risk of disputes on matters of interpretation of contractual terms. The contract is divided into six sections, set out conceptually and providing a solid structural basis for negotiations. The liabilities are equally apportioned between the parties. It also deals in detail with many difficult aspects of shipbuilding and fills the gaps in certain areas where there had been a lacuna or ambiguity in the terms of the old standard terms of contracts.
In this chapter, the basic principles of English law pertaining to shipbuilding contracts are explained, with focus mainly on the most commonly used form, the SAJ, and with examples of leading cases; it also makes comparison of some provisions with the provisions of the NEWBUILDCON.
Historically, English law treated the shipbuilding contract as one for the sale of goods. For example, in
… if the contract be such that, when carried out, it would result in the sale of a chattel, the party cannot sue for work and labour; but if the result of the contract is that the party has done work and labour which ends in nothing that can become the subject of a sale, the party cannot sue for goods sold and delivered.
Diplock J, in
… it seems well settled by authority that, although a shipbuilding contract is, in form, a contract for the construction of the vessel, it is in law a contract for the sale of goods.
Naturally, the intention of the parties to the contract is always relevant, and the result may vary from contract to contract. In
Where it appears to be the intention of the parties to a contract for the building of a ship that the vessel is not to be delivered and finally accepted until after an official trial and until after conditions of the contract have been fulfilled as to speed, consumption of coal, capacity, etc., the property in the ship does not pass to the purchaser while the vessel remains uncompleted, although the contract contains stipulations for the price to be paid by instalments at certain periods of construction.
The two House of Lords’ decisions, in
The preamble to the standard form of the SAJ contract states that the builder shall ‘build, launch, equip and complete’ the vessel and, thereafter, ‘sell and deliver’ her to the buyer. It is a special agreement to sell a ship by description after construction, which is regulated by the specific terms of the contract and the Sale of Goods Act (SOGA) 1979, as amended by the Sale and Supply of Goods Act (SSGA) 1994.
The answer to the question of whether the contract is one for sale of goods or a contract for construction and sale has significant implications on the determination of the parties’ accrued rights. There are three issues of importance:
-
whether the buyer has a property right over the partly constructed hull (this would be relevant if a third party, that is, a claimant of the buyer, or a receiver appointed to arrange the affairs of the shipbuilder, arrested the semi-constructed ship);
-
whether a buyer could claim a property right on the materials (approved by him but not yet fixed to the hull), if the contract does not expressly provide about the time of the passing of property of the materials on to the buyer;
-
what is to happen to accrued rights of the parties upon cancellation of the contract? (Invariably, however, shipbuilding contracts provide for the parties’ rights after cancellation of the contract.)
This was dealt with by the House of Lords (Sc) in
The law of England does differ from the civil law and those laws founded on it, including the Scotch law, as to what is sufficient to pass the property in a moveable chattel.… It is essential that the article should be specific and ascertained in a manner binding on both parties, for unless that be so it cannot be construed as a contract to pass the property in that article. In general, if there are things remaining to be done by the seller to the article before it is in the state in which it is to be finally delivered to the purchaser, the contract will not be construed to be one to pass the property till those things are done.
But it is competent to parties to agree for valuable consideration that a specific article shall be sold, and become the property of the purchaser as soon as it has attained a certain stage: though if it is part of the bargain that more work shall be done on the article after it has reached that stage, it affords a strong prima facie presumption against its being the intention of the parties that the property should then pass… It is, I think, a question of the construction of the contract in each case, at what stage the property shall pass; and a question of fact, in each case whether that stage has...
Get this document and AI-powered insights with a free trial of vLex and Vincent AI
Get Started for FreeStart Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting