Chapter 10: Detailed design
| Library | The Application of Contracts in Developing Offshore Oil and Gas Projects |
| Pages | 125-133 |
| Author | Philip Loots,Donald Charrett |
It is necessary to distinguish between evaluation of the design process and evaluation of the project as a whole in this phase. 1 In the detailed design process, the design work in a particular engineering discipline can be appraised only by engineers experienced in that discipline.
The quality of the design therefore rests primarily with the professional engineers working in their own fields. Any competent design organisation must both deploy competent staff and provide for their work to be checked and reviewed at all stages. It is noted that legislation, particularly in relation to HSE, has increased the likelihood that where serious errors have been made the individuals responsible could be subject to legal action.
The evaluation of the design process, whether before or after the event, focuses not on the design itself but on the quality control procedures and measures taken to secure its success, including clear objectives, team composition, coordination between disciplines, adequate time, funds and staff for checking and review, etc.
Mistakes discovered at later stages can be very costly. The project may be vulnerable with respect to the following questions:
-
Are the design briefs to the design firms or departments concerned complete, including definition of the required output, and issued sufficiently early?
-
Is there adequate provision for coordination and information exchange between these firms?
-
At what point does the design become the responsibility of a construction Contractor?
The detailed design process usually requires a significant increase in the number of design personnel on the project to handle the increased volume of work. The value of the previously formulated contract strategy, management systems and procedures should become apparent. Any significant deviation from prescribed objectives in terms of progress, quality or cost should be detected quickly through the established reporting system by the project management, who should take appropriate action. Such review and action where necessary should be a regular activity conducted at weekly, biweekly or monthly intervals, depending on the design period and the individual activity duration.
A single design organisation is frequently responsible for both the basic and the detailed design phases. For larger projects, the detailed design may be too large a task for a single firm, or may require specialised knowledge. In such situations, separate contracts for detailed design may be needed; the types of contract should have been previously decided in the basic engineering phase. Where necessary, competent design firms should also have been shortlisted so that the awards of contract and mobilisation of the teams can proceed quickly. 2
It is important that both the firms and their contracts are matched to the task, as scope for change is limited once the work is under way. Only in exceptional circumstances, for instance where the designer is seriously underperforming, should substitution of another organisation be considered. The project disruption in terms of time and cost could be considerable as the replacement organisation would have to start its work with no prior project knowledge. The alternative, less disruptive route is to supplement the designer’s areas of weakness and/or underperformance. This may be imposed as an action on the designer’s management, for example to subcontract part of the work, associated with increased project management surveillance. Alternatively, project management may wish to inject its own resources into the designer’s team using personnel known and trusted to ensure delivery of acceptable results. This approach, however, must be handled carefully to avoid diluting and confusing the contractual responsibility of the design organisation.
The detailed design phase represents the period of greatest design activity and also requires, therefore, much increased effort in the control of cost and time. 3 If the design contracts are fixed price, the cost control systems should place emphasis on containing the costs against the contracts. The planning systems should be milestone based and aimed at ensuring timely distribution of design drawings to the construction Contractor and submission of specifications and requisitions to the equipment and material vendors. If the design contracts contain cost-reimbursable elements, the costs should be controlled against the predetermined budgets in the design cost plans.
Detailed design cannot be evaluated without control data. In order to provide the required information, the project control system should include the following elements for a large or complex project:
-
planning system at key levels of management control with drawings and document schedules at the lowest level
-
a cost control system that links design labour resources or costs to the planning system as well as related procurement cost on an area basis through the work breakdown structure (WBS)
-
a change control system that formalises the recording and control of changes to the designer’s scope of work
-
a man-hour control system that allocates labour cost to the WBS
-
...
Get this document and AI-powered insights with a free trial of vLex and Vincent AI
Get Started for FreeStart Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting