This book provides a comprehensive overview of key aspects involved in developing oil and gas projects, with an emphasis on offshore projects. It is intended for those who seek to understand the subject from a practical point of view. Illustrative case studies from past and current projects are provided, to deepen the understanding of how these key aspects apply in real life.
The risks in offshore oil and gas construction are different from, and significantly greater than those in onshore projects. 1 Construction frequently takes place in very deep water, subject to severe and unpredictable weather, in locations far from existing logistical support, and the technology may be at the cutting edge of what is technically feasible. Large and specialised construction equipment is required, which because of worldwide demand, may need to be contracted several years in advance. The large capital investment and anticipated cash flow mean that any delays in completion will have significant financial consequences.
This chapter provides an overview of the steps involved in developing oil and gas projects, generally following the stages of project development and shows the process, and context in which such project development takes place. In addition, a discussion of the oil and gas industry itself is provided in
The following sequential stages are typical of a project:
-
Project identification – definition of, and parameters for, the study phase.
-
Project planning, encompassing initial studies of the technical and financial feasibility – the desired project outcomes (‘project deliverables’) are defined, and decision criteria and timing are specified for determining whether to proceed with the project.
-
Concept report – the engineering, programme and estimate are provided, and decisions are made about long lead time procurement.
-
Detailed design is started and the tendering phase of procurement follows almost simultaneously – contracts are placed as the detailed designs are completed.
-
Fabrication and construction follows award of contracts, accompanied by a rapid increase in the flow of document deliverables: contractor’s drawings, schedules and reports.
-
Commissioning begins as the construction of particular areas of the facility become available and as procured items of equipment are delivered for integration into the facility.
-
Once all areas of the facility are commissioned and tested together, the facility is fully operational. 2
-
Government, private or public bodies who have an interest in the project’s outcome and who may be able to influence the project’s outcome directly (or indeed decide if it is able to proceed at all).
-
Various groups within the Owner’s organisation and, depending on the financial structure of the project, joint venture participants, all of whom may influence the project’s outcome indirectly. Involvement by personnel in the Owner’s organisation and those other entities mentioned above who have a direct influence on the outcome of the project.
-
The Contractors, project managers, designers and vendors and suppliers. 3
Definitions in lower case are of terms that have a generally accepted meaning in the industry but are usually not defined in contracts. Where terms are first used in this book they are in bold. Although the definitions used here are typical contract usage, the exact wording of a definition may vary according to the contract being used. Some of the terminology commonly used in oil and gas contracts differs from that used in other types of construction contracts.
In this book, capitalised terms typically have a defined meaning in a specific contract. The
The Owner is also usually the
The
A
The choice of offshore facility design depends on water depth, operating conditions, reservoir size and life, type of hydrocarbons, distance from markets, size of off-take cargoes, safety, environmental impact and economics. The marketable products produced by oil and gas projects include liquified natural gas (
Floating production storage and offloading (
The FPSO vessel is held on location (
If a mooring system is used, the vessel is anchored to the seabed either by a fixed spread mooring system, or a disconnectable mooring (attached to the vessel’s bow), which is itself moored to the seabed. The FPSO vessel is regularly visited by trading tankers, sometimes referred to as shuttle tankers, to which the oil or gas from the FPSO’s storage tanks is transferred for transport to market.
An offshore platform produces oil and/or gas that is transported by pipelines to shore or to off-take tankers. The supporting structure can be constructed in steel or concrete; it can be rigidly fixed, tethered by tension cables or moored to the seabed. The foundation of a fixed platform may be fastened to the seabed with piles driven deep into the seabed, or it may be a gravity based structure (
A tension leg or semi-submersible platform comprises a hull that is entirely underwater and an operational platform supported well above the surface. Tension leg platforms are typically kept in place by cables fastened to the seafloor and are little affected by wave action. The cables are typically tensioned so that the hull buoyancy holds it firmly in place. Tension leg platforms can operate in water more than 1,500 metres deep. 8 A semi-submersible platform may also be moored to the seabed; the deepest moored semi-submersible platform currently operating is BP’s Atlantis platform, south of New Orleans in 2,150m of water. 9
Owing to an offshore platform’s massive size and weight, the practicalities of fabrication, transport and installation are a different proposition from other types of structure and are highly dependent on the availability of specialised construction equipment, including floating cranes, suitable barges and special purpose transport vessels.
Subsea production can be used in water depths for which offshore platforms are not technically or economically viable. The development of a subsea oil and gas field requires specialised equipment. The equipment must be reliable enough to safeguard the environment and make the exploitation of the subsea hydrocarbons economically feasible. Manifolds...
Get this document and AI-powered insights with a free trial of vLex and Vincent AI
Get Started for FreeStart Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting