Lukoil Asia Pacific Pte Ltd v Ocean Tankers (Pte) Ltd

JurisdictionEngland & Wales
JudgeMr Justice Popplewell
Judgment Date02 February 2018
Neutral Citation[2018] EWHC 163 (Comm)
CourtQueen's Bench Division (Commercial Court)
Docket NumberClaim No. CL-2017-000310
Date02 February 2018
Between:
Lukoil Asia Pacific Pte Limited
Claimant
and
Ocean Tankers (Pte) Limited
Defendant

[2018] EWHC 163 (Comm)

Before:

THE HONOURABLE Mr Justice Popplewell

Claim No. CL-2017-000310

IN THE HIGH COURT OF JUSTICE

BUSINESS AND PROPERTY COURTS

OF ENGLAND AND WALES

QUEEN'S BENCH DIVISION

COMMERCIAL COURT

IN THE MATTER OF THE ARBITRATION ACT 1996

AND

IN THE MATTER OF AN ARBITRATION

Royal Courts of Justice, Rolls Building

Fetter Lane, London, EC4A 1NL

Ms Natalie Moore (instructed by Clyde & Co LLP) for the Claimant

Mr Richard Lord QC (instructed by Thomas Cooper LLP) for the Defendant

Hearing dates: 26 January 2018

Judgment Approved

Mr Justice Popplewell

Introduction

1

On 8 November 2013 the Claimant (“the Charterers”) voyage chartered the tanker OCEAN NEPTUNE (“the Vessel”) from the Defendant (“the Owners”) for carriage of a minimum 35,000 metric tons, with Charterers' option up to a full cargo, of clean petroleum products, from one safe port Taiwan to one to three safe ports Australia. Demurrage was payable at US$17,500 per day pro rata. Laytime for loading and discharging was 84 hours in total at both ends, Saturdays and holidays included.

2

The Charterers appeal against the decision in a Partial Award dated 25 April 2017 (“the Award”) that in respect of delays at one of the discharge ports the demurrage claim by the Owners is not time barred.

The Charterparty terms

3

The voyage charter was contained in a fixture recap email of 8 November 2013 (“the Fixture Recap”) which incorporated the standard terms of the ExxonMobil VOY2005 form, and the Lukoil International Trading and Supply Company Exxonvoy 2005 clauses dated 30.05.2006 (“the LITASCO Clauses”), in each case as amended and supplemented in certain respects in the Fixture Recap. The charterparty terms included the following (with strike out or underlining to illustrate where the ExxonMobil VOY2005 form or the LITASCO Clauses were amended by the Fixture Recap):

ExxonMobil VOY2005 form

8. DEMURRAGE/DEVIATION RATE. The rate for demurrage and/or deviation shall be the fixed dollar figure specified in part I(J) or the rate derived by determining the applicable rate from the WORLDSCALE Demurrage Table for tonnage specified in part I (J) and multiplying that rate by the Base Freight Rate. If a Part Cargo Minimum basis is specified in part I (E) and Charterer exercises its option to load additional cargo, any demurrage and/or deviation shall, nevertheless, remain payable at either the aforesaid fixed dollar rate or at the aforesaid rate based on the tonnage specified in Part I(J), whichever is applicable. The applicable rate under this Clause shall hearing after be called “Demurrage Rate” or “Deviation Rate” as is appropriate.

9. LOADING AND DISCHARGING PORT(S)/PLACE(S)

(a) Charterer shall nominate loading or discharging port(s) and/or place(s) or order Vessel to a destination for orders. If Vessel is ordered to a destination for orders, Charterer shall thereafter nominate loading or discharging port(s) and/or place(s). All such nominations or orders shall be made in sufficient time to avoid delay to Vessel.

(b) CHANGE OF DESTINATION. After nominating loading and/or discharging port(s) or place(s) pursuant to Paragraph (a) of this Clause, Charterer may nominate new port(s) or place(s), whether or not they are within the range of the previously nominated port(s) or place(s) and/or vary the rotation of any nominated port(s) or place(s) and Owner shall issue instructions necessary to make such change(s). It is understood and agreed, however, that the aforesaid option to nominate new loading port(s) or place(s) in different ranges shall lapse on Vessel tendering Notice of Readiness at a nominated loading port or place and that aforesaid option to nominate new discharging port(s) or place(s) in different ranges shall lapse on Vessel tendering Notice of Readiness at a nominated discharging port or place. If a change to, or varying the rotation of, nominated port(s) or place(s) occurs or if Vessel is sent to a destination for orders, any time by which the steaming time to the port(s) or place(s) to which Vessel is finally ordered exceeds that which would have been taken if Vessel had been ordered to proceed to such port(s) or place(s) in the first instance shall be compensated at the Deviation Rate per running day and pro rata for a part thereof. In addition, Charterer shall pay the extra bunkers consumed during such excess time at Owner's documented actual replacement costs at the port where bunkers are next taken.

(c) Any order of Vessel to a destination for orders, all nominations and any renominations pursuant to this Clause shall be consistent with Part I (C) and (D).

13. LAYTIME/DEMURRAGE

(a) COMMENCEMENT/RESUMPTION. Laytime or time on demurrage, as herein provided, shall commence or resume upon the expiration of six (6) hours after receipt by Charterer or its representative of Notice of Readiness or upon Vessel's Arrival in Berth, whichever occurs first. Laytime shall not commence before 0600 0001 hours local time on the Commencing Date specified in Part I (B) unless Charterer shall otherwise agree, in which case laytime shall commence upon commencement of the loading

(b) EARLY LOADING. In the event Charterer agrees to load Vessel prior to commencement of laydays, laytime will begin at commencement of loading and the amount of time from the commencement of loading until 0600 0001 hours local time on the commencing date specified in Part I (B), shall be added to the laytime specified in Part I (I).

(c) DURATION. The laytime specified in Part I (I) shall be allowed free of expense to Charterer for the purpose of loading and discharging cargo and all other Charterer's purposes. Laytime or, if Vessel is on demurrage, time on demurrage, shall continue until all cargo hoses have been completely disconnected upon the final termination of the loading or discharging operation. Disconnection of all cargo hoses shall be promptly effected. If Vessel is delayed in excess of two (2) hours after such disconnection of the cargo hoses solely for Charterer's purpose, laytime or, if Vessel is on demurrage, time on demurrage shall resume upon the expiration of said two (2)-hour period and shall continue from that point until the termination of such delay.

(d) PAYMENT. Charterer shall pay demurrage per running day and pro rata for a part thereof for all time by which the allowed laytime specified in Part I (I) is exceeded by the time taken for the loading and discharging and for all other Charterer's purposes and which, under this Charter, counts as laytime or as time on demurrage.

14. LAYTIME/DEMURRAGE CONSEQUENCES

(a) SPECIFIED. Any delay to Vessel after the expiration of six (6) hours from Charterer's receipt of Notice of Readiness before Arrival in Berth or any delay to Vessel after Arrival in Berth, due to unavailability of berth (prior to Arrival in Berth), unavailability of cargo, or solely for Charterer or terminal purposes, shall count as laytime or, if Vessel is on demurrage, as time on demurrage.

(b) HALF-RATE DEMURRAGE. If demurrage is incurred and the Vessel has been delayed in berthing, loading and/or discharging (hereafter in this Paragraph (b) called “Delay”) due to: weather and/or sea conditions; [irrespective of any option given in Part I(C) and (D)]; fire; explosion; strike, picketing, lockout, slowdown, stoppage or restraint of labor; breakdown of machinery or equipment in or about the facilities of Charterer, supplier, shipper or consignee of the cargo (hereinafter in this Paragraph (b) separately and jointly called “Listed Conditions”), be the Delay prior to or after the expiration of laytime, that span of time on demurrage equal to the period or periods of Delay as just described shall be paid at half of the Demurrage Rate. If, during a period of Delay, Listed Conditions co-existed, along with any of the other conditions described in Paragraph (a) of this Clause 14, the Listed Conditions shall conclusively be deemed to be the sole cause of the delay, either if they caused the Delay independently of the other conditions or could have caused the Delay if the other conditions had not so co-existed. Weather and/or sea conditions shall include, but not be limited to, lightning, restricted visibility (the term “restricted visibility” shall mean any condition in which visibility is restricted by fog, mist, falling snow, ice, heavy rainstorms, sandstorms and any other similar causes), storm, wind, waves and/or swells. The provisions of paragraph 14 (b) shall apply irrespective of any option given in Part I (C) and (D). The foregoing provisions as to payment of half the Demurrage Rate in respect to weather and/or sea conditions shall not apply where the Vessel is lightered or discharged at sea.

(c) EXCLUSIONS. Notwithstanding the provisions of any other Paragraph of this Clause or any other Clause of this Charter to the contrary, time shall not count as laytime or, if Vessel is on demurrage, as time on demurrage, if such time is spent or lost:

(i) As a result of labor dispute, strike, go slow, work to rule, lockout, stoppage or restraint of labor involving Master, officers or crew of Vessel or tugboats or pilots unless, in the case where Charterer has load/discharge port options, a labor dispute, strike, go slow, work to rule, lockout, stoppage or restraint of labor of tug boats or pilots, is in force at the port at the time Charterer nominated such port;

(ii) On an inward passage, including, but not limited to, awaiting daylight, tide, tugs or pilot, and moving from first anchorage or first other waiting place, even if lightering has taken place at the first anchorage or first other waiting place, until Vessel's Arrival in first Berth;

(iii) Due to overflow, breakdown, inefficiency, repairs, or any other conditions whatsoever attributable to Vessel, Master, officers, crew and/or Owner, including...

To continue reading

Request your trial
64 cases
  • Montreux Capital Management (UK) Ltd v Mr John Godden
    • United Kingdom
    • Chancery Division
    • 21 March 2018
    ...[2015] AC 1619 and Wood v Sureterm [2017] AC 1173. These cases have been helpfully summarised by Popplewell J in Lukoil Asia Pacific Pte Limited v Ocean Tankers (Pte) Limited [2018] EWHC 163 (Comm) as follows: “8. There is an abundance of recent high authority on the principles applicable t......
  • Mei Fields Designs Ltd v Saffron Cards and Gifts Ltd
    • United Kingdom
    • Intellectual Property Enterprise Court
    • 6 June 2018
    ...of contracts has recently been the subject of several judgments helpfully summarised by Popplewell J in Lukoil Asia Pacific Pte Limited v Ocean Tankers (Pte) Limited [2018] EWHC 163 (Comm) as follows (at paragraph 8) (emphasis added): “There is an abundance of recent high authority on the p......
  • Paul Richards v Speechly Bircham LLP
    • United Kingdom
    • Queen's Bench Division (Commercial Court)
    • 29 April 2022
    ...a very unusual case, that meaning is most obviously to be gleaned from the language of the provision…”. 328 In “ The Ocean Neptune” [2018] 1 Lloyd's Rep 654, at [8], Popplewell J (as he then was) provided the following neat synopsis of the guidance given by the House of Lords and later the......
  • BP Oil International Ltd v Glencore Energy UK Ltd
    • United Kingdom
    • Queen's Bench Division (Commercial Court)
    • 9 March 2022
    ...to the principles of contractual interpretation summarised by Popplewell J in Lukoil Asia Pacific Pte Ltd v. Ocean Tankers (Pte) Ltd [2018] EWHC 163 (Comm) at [8]: “The court's task is to ascertain the objective meaning of the language which the parties have chosen in which to express thei......