Martlet Homes Ltd v Mulalley & Company Ltd
| Jurisdiction | England & Wales |
| Court | Queen's Bench Division (Technology and Construction Court) |
| Judge | Stephen Davies |
| Judgment Date | 14 July 2022 |
| Neutral Citation | [2022] EWHC 1813 (TCC) |
| Docket Number | Case No: HT-2019-000452 |
[2022] EWHC 1813 (TCC)
His Honour Judge Stephen Davies sitting as a High Court Judge
Case No: HT-2019-000452
IN THE HIGH COURT OF JUSTICE
BUSINESS AND PROPERTY COURTS OF ENGLAND AND WALES
TECHNOLOGY AND CONSTRUCTION COURT (QB)
Rolls Building,
London, EC4A 1NL
Jonathan Selby QC & Tom Coulson (instructed by Norton Rose) for the Claimant
Simon Hughes QC & James Frampton (instructed by Pinsent Mason) for the Defendant
Hearing dates: 14–17 & 21–24 March & 13 April 2022.
APPROVED JUDGMENT
This judgment was handed down remotely by circulation to the parties' representatives by email and by release to for publication on the National Archives caselaw website. The date and time for hand-down is deemed to be 10 am on 14 July 2022.
I direct that pursuant to CPR PD 39A paragraph 6.1 no official shorthand note shall be taken of this Judgment and that copies of this version as handed down may be treated as authentic.
His Honour Judge Stephen Davies
| Sections | Paragraphs |
| Introduction and decision | 1 – 10 |
| Summary of the facts and the parties' cases | 11 – 32 |
| The witnesses | 33 – 45 |
| The relevant contract terms | 46 – 67 |
| The claimant's pleaded case | 68 – 75 |
| The Building Regulations and associated materials | 76 – 78 |
| 79 – 90 | |
| ADB 2002 | 91 – 105 |
| BRE 135 (1988) | 106 – 120 |
| BRE 135 (2003) | 121 – 136 |
| ADB 2006 | 137 – 144 |
| BBA Certificates | 145 – 158 |
| 159 – 161 | |
| Post-Grenfell guidance | 162 – 164 |
| Breaches | 165 |
| The installation breaches | 166 – 186 |
| The specification breaches | 187 – 271 |
| Causation — overview | 272 – 278 |
| Causation — the relevant legal principles and their application | 279 – 323 |
| Causation — were the installation breaches an effective cause of the replacement works? | 324 – 360 |
| Causation — would the claimant have been entitled to recover the cost of the replacement works even without the specification breaches? | 361 – 388 |
| Causation and remoteness — the waking watch | 389 – 419 |
| Quantification | 420 |
| Quantification — the remedial works undertaken | 421 – 498 |
| Quantification — the alternative remedial scheme | 499 – 535 |
| Quantification — the waking watch | 536 – 610 |
| Interest | 611 – 612 |
| Index of commonly used abbreviations 1 |
Introduction and decision
By this claim the claimant Martlet Homes Ltd (“Martlet”) as the owner of five tower blocks in Gosport (“the Gosport towers”) seeks to recover approximately £8 million in damages from the defendant building contractor, Mulalley & Co Ltd (“Mulalley”) for costs incurred from 2017 onwards in: (a) investigating and remedying, by removal and replacement, combustible external wall insulation (“EWI” I) rendered cladding, originally fitted by the defendant between 2005 and 2008 under a design and build contract made in 2005; and (b) providing a waking watch as a fire safety precaution until the EWI cladding had been removed.
The defendant admits that there were some defects in the installation of the EWI cladding but denies that they caused, or were such as to justify, the scheme for complete replacement works (“the replacement works scheme”) in fact undertaken or the need for the waking watch. Its pleaded case and the case advanced at trial is that the real cause and justification for the replacement works and the waking watch was the claimant's realisation, triggered by the Grenfell Tower fire in June 2017, of the risk posed by the fact that the EWI cladding, being combustible, did not meet the heightened fire safety standards which had come into force after the works had been completed and which were further heightened as a result of the Grenfell fire.
It contends that only a scheme limited to limited repair works (“the repair works scheme”) was reasonably required to remedy the installation breaches, costing far less than those actually carried out, and that this cost is irrecoverable given that the claimant chose to replace rather than to repair.
In response to that pleaded case the claimant, which had initially only pleaded installation breaches, sought permission to plead a fallback case. It obtained permission from Pepperall J at first instance, whose decision is to be found at [2021] EWHC 296 (TCC). Pepperall J's decision was upheld by the Court of Appeal, whose decision is to be found at [2022] EWCA Civ 32. The claimant's fallback case is that if the court was to agree with the defendant's case on causation in relation to the installation breaches, so that the replacement costs and the waking watch costs could not be claimed in respect of those breaches, nonetheless the EWI cladding as specified did not meet applicable fire safety standards as at the date of the contract (the “specification breach case”). The claimant contends that it is entitled to recover the replacement and waking watch costs as having been caused by the specification breach as an alternative to its primary installation breach case.
The claimant's further fallback case is that at the very least it is entitled to damages representing the reasonable cost of the repair works reasonably necessary to remedy the installation breaches. It contends that this cost is far greater than allowed by the defendant and, on its valuation, not less than the cost of the replacement works actually undertaken. On the same basis it also claims its waking watch costs for the period reasonably necessary to undertake those works.
In the event, therefore, the case as advanced and defended was primarily about: (a) the causation of loss in relation to the installation breach case; (b) the merits of the alternative specification breach case; and (c) the quantum of recoverable loss as regards the replacement scheme costs actually incurred, as regards the defendant's alternative repair scheme costs, and as regards the waking watch costs.
The specification breach case is of particular interest, since it raises for determination the question whether or not the specification of combustible EWI rendered cladding breached fire safety standards as they existed in the early to mid 2000's, well before the Grenfell Tower fire. However, like most other similar cases this case turns very much on the specific contractual provisions and the specific fire safety standards applicable to the particular product chosen as well as on the particular cases pleaded and argued and the evidence called.
I am extremely grateful to the legal teams for the preparation of user-friendly electronic bundles and for co-operating to engage Opus2 to provide an electronic trial document presentation facility as well as a live note transcript. This, coupled with the skill and hard work of counsel, enabled a mass of evidence to be heard in the seven days allowed for evidence. Detailed and impressive written opening and closing submissions were followed by oral closing submissions, after which I reserved judgment.
In summary, my decision is as follows: (1) had the claimant succeeded only on the installation breach case it could only have recovered the costs incurred referable to the repair scheme and not the costs of the replacement scheme; (2) however, since the claimant succeeds on the specification breach case, it can recover the costs incurred referable to the replacement scheme; (3) although the final costs of the replacement scheme and the repair scheme will require to be finalised once the quantity surveyors have translated my findings into figures, it appears likely that on my findings in relation to the repair scheme there will be little if any difference between the replacement scheme costs and the repair scheme costs in any event; (4) the claimant succeeds on the waking watch claim in relation to the specification breach case, subject to some relatively modest reduction; (5) the claimant would also have succeeded on the waking watch scheme had it only succeeded on the installation breach case, although the valuation of the waking watch on that hypothesis would have been assessed on the basis of a lesser time period.
My reasons appear below.
Summary of the facts and the parties' cases
The Gosport towers
Five concrete tower blocks were built in the early 1960's in Gosport, Hampshire to provide social housing. Of the five, two (Harbour Tower and Seaward Tower) are both 16 storeys and around 50 metres high. The remaining three (Blake Court, Hammond Court and Garland Court) are each 11 storeys and around 30 metres high. All five are thus significantly in excess of 18 metres in height, which is relevant because such buildings have been the subject of special attention in fire safety provisions over the years, reflecting the increased fire safety risk to those occupying them.
In the early 2000's a decision was made by their then owners, a social housing company known as Kelsey Housing Association Limited (“Kelsey”), to refurbish the five towers. The works included the application of EWI cladding to most elevations to improve their resistance to cold and damp penetration. The works were undertaken by the defendant under a design and build contract made under seal with Kelsey. The works to Garland Court were completed first, on 5 December 2006, followed by Hammond Court and Blake Court on 15 December 2007 and Harbour Tower and Seaward Tower on 7 April 2008.
No claim is made in relation to Garland Court only because the works were completed more than 12 years before this claim was issued. The claimant accepts that under the law as at the date of the trial any such claim was statue barred under the Limitation Act 1980.
The claimant
Martlet acquired the Gosport towers from Kelsey so that as at 2017 it was, and it...
Get this document and AI-powered insights with a free trial of vLex and Vincent AI
Get Started for FreeStart Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant
-
Access comprehensive legal content with no limitations across vLex's unparalleled global legal database
-
Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength
-
Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities
-
Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting
Start Your Free Trial
-
HB (WM) Ltd & Others v Sto Ltd
...to class 0 and to add that EPS “is not classified as non-combustible or of limited combustibility.” i. In Martlet Homes Ltd v. Mulalley & Co Limited [2022] EWHC 1813 (TCC) at [65] HH Judge Stephen Davies noted that “… it is common ground that the Sto insulation boards were not (and had neve......
-
Mulalley & Co Limited v STO Limited & Anor
...8-day trial in the TCC in March 2022, HHJ Stephen Davies gave a judgment dated 14 July 2022 in Martlet’s favour: Martlet Homes Ltd v Mulalley & Co Ltd [2022] EWHC 1813 (TCC), 203 ConLR 125. At [259] he held that the StoTherm Classic System did not comply with requirement B4(1) of the Buildi......
-
Mulalley & Company Ltd v Sto Ltd
...agreement. Again, I accept Mr Taylor's evidence as further moderated by Mr Frampton's concession. REASONABLENESS 14 In Martlet v. Mulalley [2022] EWHC 1813 (TCC), His Honour Judge Davies rightly observed, at [422], that the courts are “generally reluctant to criticise, with the benefit of h......
-
Chapter 14: Remedies for defects and the Building Safety Act 2022
...commercial value as the builder appeared to have no assets (see paragraph [4] of the judgment). So also in Martlet Homes Limited v Mulalley & Co Ltd [2022] EWHC 1813 (TCC) at paragraph 4 See for example Sheffield Teaching Hospital Foundation Trust v Hadfield Healthcare Partnerships Ltd [202......
-
Chapter 8: English residential building law – from Anns to Grenfell and beyond
...the Grenfell Tower fire shifts everyone's focus from structural inadequacy to combustible external cladding (or insulation). Martlet Homes v Mulalley is the first such case to reach judgment in the Technology and Construction Court (TCC). 18 It concerns a series of design-and-build refurbis......
-
Chapter 14. Defects
...1463; Beattie Passive Norse Ltd v Canham Consulting Ltd [2021] EWHC 1116 (TCC) at [115], per Fraser J; Martlet Homes Ltd v Mulalley & Co Ltd [2022] EWHC 1813 (TCC) at [307]–[309], per HHJ Stephen Davies; St James’s Oncology SPC Ltd v Lend Lease Construction (Europe) Ltd [2022] EWHC 2504 (TC......
-
Chapter 10. Negligence
...Ltd [2018] SGCA 37 at [39]; So Kai Hau v YSK2 Engineering Co Ltd [2018] HKCFI 1803 at [70], per Bharwaney J; Martlet Homes Ltd v Mulalley & Co Ltd [2022] EWHC 1813 (TCC) at [271],per HHJ Stephen Davies; McCulloch v Forth Valley Health Board [2023] UKSC 26. 204 BNP Mortgages Ltd v Barton Coo......