Chapter 2: Project participants

LibraryThe Application of Contracts in Developing Offshore Oil and Gas Projects
Pages17-24
AuthorPhilip Loots,Donald Charrett
2.1: Direct participants

R K Corrie 1 defines the participants in a project as direct, indirect or external.

2.1.1: The Owner

The Owner, also known as the Principal, or Employer, or sometimes the Company, is the body responsible for making decisions on the development of the project.

2.1.2: The project manager

The project manager plans the works, monitors and directs the participants and seeks to ensure that the project is completed on schedule, within budget and to the required quality. In practice, the project manager may be a member of the Owner’s staff and may be in an executive position in the organisation. Alternatively, he or she may be a separate appointee with no direct responsibility for design or construction, being rather in an overseeing and liaison role. The project manager is usually an individual or organisation having a predominantly technical background, with experience in multidisciplinary projects. Most people are aware of the role of the project manager as distinct, for example, from that of a design leader.

2.1.3: The designers

The design leader is the Owner’s technical participant and should be carefully selected for technical competence, experience and ability to manage the design team. The designer may own a particular process or know-how which is protected by law.

2.1.4: The Contractor

The Contractor is the organisation which undertakes the construction work. At one extreme, a turnkey Contractor may be responsible for planning and design as well as procurement and construction. At the other extreme, the Contractor may simply be employed by the Owner to provide labour to erect or install the Owner’s own equipment; in-between lies a wide range of contractual arrangements.

2.1.5: Vendor or supplier

A vendor or supplier is one who supplies materials or equipment manufactured away from the project work site. A vendor may also install and commission materials and equipment at the site. Materials and equipment, their sources and available options for supply, may be important factors in evaluation. The logistics of the project are greatly influenced by suppliers. The planning, inspection and approval of subcontractors and suppliers are fundamental tasks for the project management team.

2.2 Case study: fraudulent misrepresentation on key project personnel

Contractors and consultants often make pre-contractual statements to secure projects. A common pre-contractual statement is the promised involvement of a particular individual or group of individuals to comprise a project team. The assignment of an individual or team to key posts may distinguish a tenderer from its competitors and provide a material reason for winning the contract. But what happens if the named person resigns or is removed from the project before the contract is formally awarded?

The UK decision Fitzroy Robinson Limited v Mentmore Towers Limited; Fitzroy Robinson Limited v (1) Good Start Limited (2) Anglo Swiss Holdings Limited [2009] EWHC 1552 (TCC) deals with the issue of a party’s duty to disclose circumstances affecting the validity of a pre-contractual statement regarding key personnel.

2.2.1: Facts

The case involved the engagement of Fitzroy Robinson Limited (FRL) to act as lead consultant in connection with a scheme to develop the In & Out Club in Piccadilly and the Mentmore Towers (the Project). The properties to be developed were owned by three related companies (collectively, the defendants). The defendants were advised by Buckingham Securities Holdings (BSH).

FRL first made its bid for the Project in 2005. The key member of the FRL team was Mr Blake, the director who compiled the FRL bid documents and was involved in all the pre-contractual meetings. Throughout all negotiations, FRL stated both orally and in its bid documents that Mr Blake was to be FRL’s team leader for the entire duration of the Project. The Project was estimated to take 38 months, and completion was scheduled for May 2009.

On 17 March 2006, before the consultancy agreements with FRL were executed, Mr Blake...

Get this document and AI-powered insights with a free trial of vLex and Vincent AI

Get Started for Free

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex