R (on the application of Nobel Oil E&P North Sea Ltd) v The Oil and Gas Authority t/a the North Sea Transition Authority

JurisdictionEngland & Wales
CourtAdministrative Court
JudgeMr Justice Dove,Lord Justice Males
Judgment Date12 August 2025
Neutral Citation[2025] EWHC 2139 (Admin)
Docket NumberCase No: AC-2024-LON-002888
Between:
R (on the application of Nobel Oil E&P North Sea Limited)
Claimant
and
The Oil and Gas Authority t/a the North Sea Transition Authority
Defendant

and

(1) Total Energies E&P North Sea UK Limited
(2) Total Energies E&P International K1 Limited
(3) Total Energies E&P International K2 Limited
(4) Total Energies E&P International K3 Limited
(5) Apache Beryl Limited
(6) Taqa Bratani Limited
(7) Secretary of State for Energy Security and Net Zero
(8) Sojitz Energy Development Limited
Interested Parties
Before:

Lord Justice Males

Mr Justice Dove

Case No: AC-2024-LON-002888

AC-2025-LON-000801

IN THE HIGH COURT OF JUSTICE

KING'S BENCH DIVISION DIVISIONAL COURT

Royal Courts of Justice

Strand, London, WC2A 2LL

James Maurici KC and Ben Fullbrook (instructed by Brodies LLP Solicitors) for the Claimant

Kate Gallafent KC, Jane Collier, Warren Fitt and Tom Lowenthal (instructed by NSTA Legal) for the Defendant

Lord Keen of Elie KC and Daniel Cashman (instructed by Stronachs LLP) for the First to Fourth Interested Parties

Victoria Hutton and Gethin Thomas instructed by the Government Legal Department for the Seventh Interested Party

Hearing dates: 3–5 June 2025

Draft judgment circulated to parties on 31 July 2025

Approved Judgment

This judgment was handed down remotely at 12.00pm on 12 August 2025 by circulation to the parties or their representatives by e-mail and by release to the National Archives.

Mr Justice Dove

Introduction

1

This case concerns the decommissioning of a Floating Production Storage and Offloading vessel (“FPSO”) known as the Gryphon FPSO. The claimant, who is a part owner in two oil fields served by the Gryphon FPSO, brings this judicial review in relation to two of the steps required under the Petroleum Act 1998 to enable oil infrastructure in the form of the Gryphon FPSO to be decommissioned and removed. The defendant is a statutory regulator of the petroleum industry in the North Sea and has particular responsibilities in relation to the decommissioning process which are detailed below. Total Energies E&P North Sea Limited (“Total”) are an operator and owner in the North Sea petroleum industry and they are the joint owner of the Gryphon FPSO. The Offshore Petroleum Regulator for Environment and Decommissioning (“OPRED”) is part of the Department for Energy Security and Net Zero. OPRED, whilst not a separate legal entity, is the part of the Department for Energy Security and Net Zero which performs the Secretary of State's functions in relation to Part 4 of the 1998 Act as set out below.

2

This judgment relates to two applications for judicial review. The first, JR1, relates to the advice given by the defendant to Total pursuant to section 29 of the 1998 Act. Permission to apply for judicial review was granted at an oral hearing on 13 February 2025. The second judicial review, JR2, relates to the advice given by the defendant to OPRED as required by section 32 of the 1998 Act for the purposes of enabling OPRED to make its own decision in relation to the decommissioning plan pursuant to section 32 of the 1998 Act. JR2 is before the court for a “rolled up” hearing. On 30 April 2025 a hearing occurred in relation to the claimant's application for a stay of OPRED's decision under section 32 of the 1998 Act, but that application was refused in a decision given on 1 st May 2025.

Background

3

The Gryphon FPSO is owned jointly by Total and Sojitz Energy Development Limited (“Sojitz”) and is operated by Total. In addition to the Gryphon Field (which is also jointly owned by Total and Sojitz), three other neighbouring fields have been tied back to the Gryphon FPSO for the purposes of oil production. These are the Tullich field, the Maclure field and the Ballindalloch field. The claimant has an interest in the Maclure and the Ballindalloch fields of around 8 per cent in each. Total owns the whole of the Tullich field and the remainder of the ownership of the Ballindalloch field. The Maclure field is owned jointly by Total, the claimant, TAQA and Apache.

4

The Gryphon FPSO was built in 1993 and refurbished following a major incident in 2012. It is permanently moored above an oil field and connected to sub-sea oil and gas infrastructure by flexible pipelines leading to oil and gas treatment equipment which is mounted on its deck. Oil was periodically offloaded having been stored in the FPSO's cargo tanks. It is retained in position by anchors and mooring lines and is equipped with thrusters to enable it to be faced into the weather, reducing the load on the mooring lines.

5

The relationship between the owners of the Gryphon FPSO and the owners of the fields who receive the services provided by that infrastructure as a result of being tied back to the Gryphon FPSO is governed by Processing and Operational Services Agreements (“POSAs”) which amongst other issues address how the running costs of the Gryphon FPSO are to be distributed amongst those who use its facilities.

6

Around April 2021 the owners of the Gryphon FPSO approved a life extension project which involved works taking place to improve the integrity of the Gryphon FPSO and the renewal of its class certification to extend it until November 2027. Following a survey of the Gryphon FPSO, recertification was granted on 15 February 2023 to 15 November 2027.

7

The owners of the fields are party to a petroleum production licence which is issued by the defendant on behalf of the Crown and which allows the licensee to search for and extract petroleum in a specified area. To develop a field within a licence area the licensee must receive approval of a field development plan from the defendant addressing their proposals for extraction and the likely volumes of petroleum to be extracted.

8

The various fields identified above have all produced oil (and some gas) from the oil reservoirs that were being exploited. However, once oil production has ceased there is a gas “cap” overlying the oil reservoirs which can be developed as a project for extraction in its own right. A project has been formulated known as the Quad 9 Gas Project (“Q9GP”) for the gas extraction. When gas production commences the reservoir pressures will drop, preventing the extraction of any further oil. At present the ownership of the gas cap currently vests in the same owners as set out above but in different percentage interests. The infrastructure which would be required to produce gas from the gas cap has not been settled upon and in accordance with the current arrangements there would need to be unanimity between the owners on the appropriate configuration of the Q9GP project before it could be progressed.

The Regulatory Framework

9

Section 1 of the 1998 Act defines “petroleum” as including “any mineral oil or relative hydrocarbon and natural gas existing in its natural condition in strata”. Section 3 contains the power to grant licences to “search and bore for and get petroleum”. Section 9A of the 1998 Act contains what is described as the principal objective and the strategy of the 1998 Act, in particular the maximising of the economic recovery of oil (“MER”) which is described in the following terms:

“ 9A The principal objective and the strategy

(1) In this Part the “ principal objective” is the objective of maximising the economic recovery of UK petroleum, in particular through—

(a) development, construction, deployment and use of equipment used in the petroleum industry (including upstream petroleum infrastructure), and

(b) collaboration among the following persons—

(i) holders of petroleum licences;

(ii) operators under petroleum licences;

(iii) owners of upstream petroleum infrastructure;

(iv) persons planning and carrying out the commissioning of upstream petroleum infrastructure;

(v) owners of relevant offshore installations.

(2) The [OGA] must produce one or more strategies for enabling the principal objective to be met.

(3) A strategy may relate to matters other than those mentioned in subsection (1)(a) and (b).

(4) For provision about producing and revising a strategy, see sections 9F and 9G.”

10

Within the context of the 1998 Act the defendant is described as the OGA. Section 9B sets out the exercise of certain functions of the defendant. Section 9BA goes on to define certain functions of the Secretary of State which, as described above, are in this case exercised by OPRED. Those two sections provide so far as material as follows:

“ 9B Exercise of certain functions of the [OGA]

The [OGA] must act in accordance with the current strategy or strategies when—

(a) exercising functions under the other Parts of this Act (except Part 4),

(b) exercising functions under Part 4,

(c) exercising functions under Chapter 3 of Part 2 of the Energy Act 2011 (upstream petroleum infrastructure),

(ca) exercising functions under Part 2 of the Energy Act 2016,

(d) exercising any function or using any power under a petroleum licence, and

(e) exercising any other function or using any power—

(i) to provide advice or assistance to another person, or

(ii) to acquire, use or supply information, for the purpose of enabling the principal objective to be met.

9BA Exercise of certain functions of the Secretary of State

(1) The Secretary of State must act in accordance with the current strategy or strategies when exercising the functions mentioned in subsection (2).

(2) Those functions are functions under Part 4 to the extent that they concern reduction of the costs of abandonment of offshore installations and submarine pipelines (including the reduction of such costs by means of the timing of measures proposed in abandonment programmes and by the inclusion in such programmes of provision for collaboration with other persons).”

11

Section 28A provides a restriction on the decommissioning of petroleum related infrastructure in offshore installations or submarine pipelines in the following terms:

“ 28A Restriction on abandonment

...

Get this document and AI-powered insights with a free trial of vLex and Vincent AI

Get Started for Free

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex
1 cases
  • The King (on the application of The University of Sussex) v The Office for Students
    • United Kingdom
    • Administrative Court
    • 29 April 2026
    ...of the test altogether.” 358 The principle of predetermination was considered in the regulatory context in R (Nobel Oil) v Oil and Gas Authority [2025] EWHC 2139. The Divisional Court made an important point about the correct approach to such an allegation in respect of a regulator; “70. Pr......