R Utilita Energy Ltd v Secretary of State for Business, Energy and Industrial Strategy

JurisdictionEngland & Wales
CourtQueen's Bench Division (Administrative Court)
JudgeMr Justice Lewis
Judgment Date07 October 2019
Neutral Citation[2019] EWHC 2612 (Admin)
Docket NumberCase No: CO/53/2019
Date07 October 2019
Between:
The Queen on the Application of Utilita Energy Limited
Claimant
and
Secretary of State for Business, Energy and Industrial Strategy
Defendant
Before:

THE HONOURABLE Mr Justice Lewis

Case No: CO/53/2019

IN THE HIGH COURT OF JUSTICE

QUEEN'S BENCH DIVISION

ADMINISTRATIVE COURT

Royal Courts of Justice

Strand, London, WC2A 2LL

Victoria Wakefield Q.C., Malcolm Birdling and Zahra Al-Rikabi (instructed by Blake Morgan LLP) for the Claimant

Anneli Howard, Anneliese Blackwood and Imogen Proud (instructed by Government Legal Department) for the Defendant

Hearing dates: 23, 24 and 25 July 2019

Approved Judgment

Mr Justice Lewis The Honourable

INTRODUCTION

1

This is a claim for judicial review of three decisions taken by the defendant in connection with the government's programme for ensuring the provision of smart electricity and gas meters to domestic homes and smaller non-domestic premises in Great Britain. Smart meters enable communication between the meter at the property where it is installed and the energy supplier. There are two types of meters involved and they are referred to in this judgment as SMETS1 and SMETS2 meters.

2

There are three decisions under challenge. The first is a decision of 4 October 2018 to amend the standard conditions of relevant licences so as to require energy suppliers to take all reasonable steps to enrol eligible SMETS1 meters with the Data Corporation Company (“DCC”) within twelve months of them becoming eligible for enrolment and to impose an obligation on suppliers to replace any unenrolled SMETS1 meters with a SMETS2 meter by 31 December 2020 (“the First Decision”).

3

The second is a decision also taken on 4 October 2018 that SMETS1 meters installed after 15 March 2019 will not be taken into account when considering whether an energy supplier has complied with its duty to make arrangements for the installation of smart meters (“the Second Decision”). The third is a decision of 23 May 2019 requiring the DCC to provide services to the type of SMETS1 meters used by the claimant, Utilita Energy Ltd, (Utilita”) to enable those meters to be enrolled with the DCC (“the Third Decision”).

4

Permission was granted by Walker J. to challenge the First and Second decisions. The claimant has also applied to re-amend the grounds to seek permission to challenge the Third Decision.

5

In relation to the First Decision, there are five grounds of challenge. In brief, these are as follows. The claimant contends that the First Decision was irrational and failed to treat the claimant in a consistent way with other companies. It contends that the decision was taken without proper consultation as it was unclear whether the obligation would apply to all unenrolled meters including the SMETS1 meters used by the claimant. It claims that the defendant failed to assess the environmental impact of imposing an obligation to remove existing, unenrolled meters by the end of 2020. It contends that the requirement that it replace all its enrolled SMETSI 1 meters on 31 December 2020 involved a breach of its rights under Article 1 of the First Protocol to the European Convention on Human Rights (“A1P1”) and what it describes as its common law property rights. Finally, it contends that the defendant failed to comply with its duty under section 149 of the Equality Act 2010 (“the 2010 Act”) to have due regard to certain equality matters and to the duties to have regard to other specified considerations as set out in section 4AA of the Gas Act 1986 and section 3A of the Electricity Act 1989.

6

In relation to the Third Decision, it is said that the defendant made what are described as material errors of assessment or took into account irrelevant considerations, or failed to take account of relevant ones, and the consultation which preceded the decision was predetermined.

7

In relation to both the Second and Third Decisions, the claimant contends that the defendant failed to comply with its duty under section 149 of the 2010 Act to have due regard to certain equality matters or to have regard to other relevant statutory considerations set out in section 4AA of the Gas Act 1986 and section 3A of the Electricity Act 1989.

THE FACTS

Background

8

Smart meters are gas and electricity meters which provide two-way communication between the premises where the meter is installed and the energy supplier. They are believed to offer significant benefits to customers and to the wider environment.

9

There are two generations of smart meters. The first generation of smart meters are meters known as SMETS1 meters. There are six brands, or “cohorts”, of SMETS1 meters. They are operated through, and messages are communicated via, a particular operating system referred to as an SMSO. Energy suppliers may have access to one or more SMSOs. At present, however, if a customer with a SMETS1 meter wishes to change energy supplier, that may render the customer's exsiting SMETS1 meter incapable of two-way communication as the new energy supplier may not have access to the SMSO used by the meter currently serving the customer's property. The new energy supplier would, therefore, have to install a new smart meter, that is a new SMETS1 meter, able to communicate information using its system.

10

The second generation of smart meters are known as SMETS2 meters. They operate, and communicate, via a single operating system, operated by the DCC. Thus, if a customer switches energy supplier, there is no need to change the smart meter as the new energy supplier is able to communicate with the SMETS2 meter using the DCC system.

11

Furthermore, if a SMETS1 meter is connected or “enrolled” with, and communicates via, the DCC system, a new energy supplier will also be able to use that existing SMETS1 meter to communicate and receive messages. In those circumstances, if a customer whose SMETS1 meter is enrolled on the DCC changes supplier, the new supplier will be able to operate via the DCC and without any need for the customer to change the smart meter. In the jargon used in the industry, this will ensure interoperability whereby any energy supplier who is a DCC user will be able to use any enrolled SMETS1 or a SMETS2 smart meter for the purpose of two-way communication between the energy supplier and the customer's smart meter.

The Claimant

12

Utilita is an energy supplier. 93% of its customers are pre-payment customers, that is, they pay for their energy before they use it, usually by adding credit to their meters. A higher proportion of the claimant's customers are pre-payment customers as compared with other energy suppliers although there are energy suppliers which have a higher absolute number of pre-payment customers. Prepayment customers are significantly more likely than other customers to be elderly, on lower incomes, or to be disabled.

13

The claimant uses a brand, or type, of SMETS1 meters manufactured by Secure. Utilita entered into a contract with the supplier which gave Utilita the contractual right to use each Secure SMETS1 meter it acquired for a period of 10 years. It has, over time, acquired the right to use in excess of 1 million of these smart meters. It has installed these meters in customers' homes. These Secure SMETS1 meters operate and communicate with the claimant via Secure's SMSO.

The Government's Policy

14

Since 2011, government policy has been to ensure that every home in Great Britain is offered a smart meter by the end of 2020. The policy is set out in the Smart Metering Implementation Programme. That programme sets out some of the anticipated benefits for consumers, including having up-to-date (described as “near real-time”) information to assist them to understand and manage their energy use more efficiently and to save money and to obtain better tariffs, advice on energy efficiency and better customer service. Meters could be read remotely without a meter reader needing to visit a customer's home. They would provide flexibility on means of payment and enable customers to switch energy suppliers more easily.

15

As part of the programme, energy suppliers are subject to a duty (referred to as the roll-out duty) imposed by their standard gas or electricity licence conditions, in the following terms (using the electricity standard licence as an example):

“The roll-out duty

39.1 The licensee must take all reasonable steps to ensure that a Smart Metering System is installed on or before 31 December 2020 at each Domestic premises or Designated Premises in respect of which it is the relevant Electricity Supplier.”

16

It appears that there are targets for each energy supplier for the number of smart meters to be installed. The regulator, Ofgem, can take enforcement action against energy suppliers who do not fulfil their targets. The precise details of the mechanism by which targets are set and enforced do not appear from the evidence. The 2011 implementation programme document also envisaged the creation of the DCC to provide a single data and communications system. Government policy also anticipated that there would be a transition from SMETS1 to SMETS2 meters. In July 2013, the government confirmed that its intention was that it would introduce a date after which the installation of a SMETS1 meter would no longer count towards meeting a supplier's roll out duty.

The April 2018 Consultations

17

In April 2018, the defendant issued two separate consultation papers. One involved consulting on maximising interoperability for SMETS1 meters. That consulted on two options. The preferred option, Option 1, was an option whereby energy suppliers would be required to take all reasonable steps to enrol their eligible SMETS1 meters with the DCC or replace them with SMETS2 meters within 6 months of the point at which SMETS1 meters could be enrolled. Further, as what was described as “a backstop”, energy suppliers would be required to replace any SMETS1 meter...

Get this document and AI-powered insights with a free trial of vLex and Vincent AI

Get Started for Free

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex
1 cases
  • R the Police Superintendents' Association v HM Treasury
    • United Kingdom
    • Queen's Bench Division (Administrative Court)
    • December 15, 2021
    ...material decision was made: for example, R (Utilita Energy Limited) v Secretary of State for Business, Energy and Industrial Strategy [2019] EWHC 2612 (Admin), para 77; and R (Durand Education Trust) v Secretary of State for Education [2020] EWCA Civ 1651, para 72–76. However, Mr Sharland ......