Waghorn v George Wimpey & Company Ltd

JurisdictionEngland & Wales
CourtQueen's Bench Division
Year1969
Date1969
[QUEEN'S BENCH DIVISION] WAGHORN v. GEORGE WIMPEY & CO. LTD. [1966 W. No. 3796]

1969 June 16, 17

Geoffrey Lane J.

Practice - Pleadings - Negligence - Departure - Unforeseeable facts emerging during case - Effect - Plaintiff found to have been injured at place other than as pleaded - Pleaded negligence irrelevant - No evidence satisfying court of defendant's breach of duty on facts found - Whether claim to be dismissed.

The defendants were sub-contractors on an oil refinery site which consisted of a number of large capacity oil tanks grouped in blocks of four. Each group was surrounded by a primitive earthwork bank some four and a half feet high with sides sloping at 30 degrees. About 25 feet from one of the banks a caravan beside a path was placed for the use of the defendants' workmen, some of whom had to cross the bank fairly frequently during the course of their employment. The plaintiff, who slipped, fell and was injured, claimed damages for negligence against the defendants who employed him. He pleaded and called evidence to show that the alleged negligence caused the accident while he was crossing over the bank and that the slope was dangerously slippery, but it was found that the accident had happened by the side of the caravan and nowhere near the bank so that the pleaded allegations of negligence were irrelevant.

On the contention that the plaintiff should not be prejudiced by the departure from facts alleged:—

Held, that, since the version of facts found was not just a variation, modification or development, but was something new, separate and distinct and not merely a technicality (post, p. 1771A, B), there had been so redical a departure from the pleaded case as to disentitle the plaintiff to succeed (post p. 1771F), for if his case had been pleaded in accordance with the facts found the defendants' preparation and presentation would have been different (post, p. 1771C, D). Accordingly, there being no evidence to satisfy the court that the defendants were in breach of their duty to take care with regard to siting the caravan or the state of the path beside it, the claim should be dismissed (post, p. 1772E–G).

John G. Stein & Co. Ltd. v. O'Hanlon [1965] A.C. 890; [1965] 2 W.L.R. 496; [1965] 1 All E.R. 547, H.L.(Sc.) distinguished.

Per curiam. It is wrong to dismiss a claim because pleadings do not measure up to technical facts which emerge during a case, particularly if they are technicalities possibly not foreseeable by pleaders (post, p. 1771B, C).

The following case is referred to in the judgment:

Stein (John G.) & Co. Ltd. v. O'Hanlon [1965] A.C. 890; [1965] 2 W.L.R. 496; [1965] 1 All E.R. 547, H.L.(Sc.).

No additional cases were cited in argument.

ACTION.

The plaintiff, Benjamin Waghorn, was employed by the defendants, George Wimpey & Co. Ltd., who were sub-contractors on an oil refinery site on the Isle of Grain, in Kent, owned by British Petroleum Ltd. The defendants were engaged in installing and maintaining the pipework on the site where there was a large number of oil tanks grouped in blocks of four. Each group was surrounded by a primitive earthwork bank called a “bund-wall”; these were some four and a half feet high with sides sloping at angles of around 30 degrees. The defendants had supplied mobile caravans for the use and convenience of their workmen; one of these caravans was situated 20 or 25 feet distant from one of the bundwalls just off a metalled or semi-metalled road. A system of central heating was installed in the caravan with hot pipes running from it over the bund-wall to a steam outlet pipe, or valve. The plaintiff alleged in his pleadings that he slipped and fell to the ground whilst crossing the bund-wall and thereby sustained personal injury. He alleged that the defendants were negligent in the following particulars: (a) that they stationed the caravan on or near sloping ground; (b) that they so situated the steam valve and the caravan that access between them lay over a bund-wall consisting of steeply sloping earth; (c) that they failed to provide a path cut in steps between the caravan and the steam valve; (d) that they failed to provide cat-walks to surmount the bund-wall; (e) that they failed to lay ashes between the bund-wall and the steam valve; (f) that they failed to take any of the suggested precautions notwithstanding that buckets of water were frequently carried from the steam valve to the caravan and that the employees of British Petroleum Ltd. were accustomed to wash at or near where he fell, whereby the ground became wet and slippery; (g) that they failed to take any of the suggested precautions notwithstanding that British Petroleum Ltd., as the defendants well knew from their knowledge of the site over a period of ten years, provided stepped paths and cat-walks on every other bund-wall on the site; (h) that they failed to take any of the suggested precautions notwithstanding that the plaintiff had previously complained to a chargehand about the condition between the caravan and the steam valve; (i) that they failed to provide a safe system of work, by reason of their failure to take any of the suggested precautions.

The defendants denied each of the allegations of negligence and pleaded that the accident was caused wholly or in part by the plaintiff's own negligence.

The evidence called by the plaintiff was in accordance with the facts he had pleaded.

The facts as found are fully stated in the judgment.

Peter Archer for the plaintiff.

E. A. Machin for the defendant.

GEOFFREY LANE J. In this action Benjamin Waghorn claims damages from his employers, George Wimpey & Co. Ltd., in respect of injuries which he suffered in a fall on February 12, 1964.

The circumstances of the accident were these, and this part of the case at least is not the subject of dispute between the parties: the defendants were engaged as a long-term project upon an oil refinery site belonging to British Petroleum Ltd. (“B.P.”) on the Isle of Grain. The task of the defendants was to instal and to maintain the very large quantity of pipework which existed at the refinery. For that purpose there was on and about the refinery site a large number of the defendants' workpeople. The site itself consisted, so far as is necessary to explain in this action, of a number of large capacity tanks grouped in blocks of four and containing fluids which would do damage were they to escape. Consequently, each block of four tanks was surrounded by a primitive rampart called a bund-wall, or bank. It consisted of earth about four and a half feet high, and its sides sloped at an angle of about 30 degrees. Where the bank had been in position for some time grass grew on it, so far as was permitted by the passage of men's feet.

In order to provide for the convenience of their workpeople the defendants had stationed at various points mobile two-wheeled...

Get this document and AI-powered insights with a free trial of vLex and Vincent AI

Get Started for Free

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex

Start Your Free Trial of vLex and Vincent AI, Your Precision-Engineered Legal Assistant

  • Access comprehensive legal content with no limitations across vLex's unparalleled global legal database

  • Build stronger arguments with verified citations and CERT citator that tracks case history and precedential strength

  • Transform your legal research from hours to minutes with Vincent AI's intelligent search and analysis capabilities

  • Elevate your practice by focusing your expertise where it matters most while Vincent handles the heavy lifting

vLex
61 cases