The A470 Trunk Road (Brecon Eastern Bypass, Powys) (Temporary Prohibition of Traffic) Order 2024
Made 16January 2024
Coming into force 22January 2024
The Welsh Ministers, as traffic authority for the A470 trunk road, are satisfied that traffic on a specified length of the trunk road should be prohibited because of works proposed on or near the road.
The Welsh Ministers, therefore, in exercise of the powers conferred upon them by section 14(1) and (4) of the Road Traffic Regulation Act 1984(1), make this Order.
Title and commencement
1. The title of this Order is the A470 Trunk Road
(Brecon Eastern Bypass, Powys) (Temporary
Prohibition of Traffic) Order 2024 and this Order
comes into force on 22 January 2024.
Interpretation
2. In this Order—
“the trunk road” (“y gefnffordd”) means the length
of the A470 Cardiff to Llangurig trunk road at
Brecon, Powys that extends from its junction with
the north-eastern side of the A40/A470/B4601
Brynich Roundabout to its junction with the
B4602 Troed-yr-harn junction;
(1) 1984 c. 27; section 14 was substituted by the Road Traffic
(Temporary Restrictions) Act 1991 (c. 26), section 1(1) and
Schedule 1. By virtue of S.I. 1999/672, and section 162 of,
and paragraph 30 of Schedule 11 to, the Government of
Wales Act 2006 (c. 32), these functions are now exercisable
by the Welsh Ministers in relation to Wales.
“works period” (“cyfnod y gwaith”) means the
intermittent periods commencing at 19:00 hours on
22 January 2024 and ending when the temporary
traffic signs for each period of works are
permanently removed.
Prohibitions
3. No person may, during the works period, drive
any vehicle on the length of the trunk road specified in
article 2 of this Order.
4. No person may, during the works period, ride any
pedal cycle on the length of the trunk road specified in
article 2 of this Order.
5. No pedestrian may, during the works period,
proceed on the length of the trunk road specified in
article 2 of this Order.
6. No equestrian may, during the works period,
proceed on the length of the trunk road specified in
article 2 of this Order.
Application
7. The prohibitions in articles 3, 4, 5 and 6 apply
only during such times and to such extent as indicated
by traffic signs.
Duration of this Order
8. The maximum duration of this Order is 18
months.