Airdrie-Bathgate Railway and Linked Improvements Act 2007

JurisdictionScotland
Citation2007 asp 19
Year2007
(a) the scheduled works referred to in section 2 (“the scheduled works”) ; and(b) the ancillary works referred to in section 3 (“the ancillary works”) .(1) The scheduled works are the works situated within the lateral limits of deviation shown on the Parliamentary plans, at the levels shown on the Parliamentary sections and specifically described in schedule 1 to this Act.(2) The extent of the scheduled works for which authority is given by this section is subject to section 4 (which permits deviation within limits from the lines and levels shown on the Parliamentary plans and sections) .(1) The ancillary works are such works of the nature described in schedule 2 to this Act as may be necessary or expedient for the purposes of, in connection with or in consequence of the construction of the scheduled works.within the limits of deviation; andon land specified in columns (1) , (2) and (3) of Part 1, 2 or 3 of schedule 5 for the purpose specified in relation to that land in column (4) of that Part (being land shown on the Parliamentary plans as lying within the limits of land to be acquired or used) .(3) The authorised undertaker may construct and maintain ancillary works identified in paragraphs 10 and 11 of schedule 2 to this Act anywhere within the limits of deviation or the limits of land to be acquired or used.(a) deviate laterally from the lines or situations shown on the Parliamentary plans within the limits of deviation for that work shown on those plans; andupwards by a maximum of 3 metres;

To continue reading

Request your trial

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT