Mallaig Harbour Revision Order 1995

JurisdictionUK Non-devolved
CitationSI 1995/3109
Year1995

1995 No. 3109 (S.229)

HARBOURS, DOCKS, PIERS AND FERRIES

The Mallaig Harbour Revision Order 1995

Made 27th November 1995

Coming into force 1st December 1995

Whereas the Secretary of State has, in pursuance of paragraph 1A of Part I of Schedule 3 to the Harbours Act 19641, determined that the application for this Harbour Revision Order is made in relation to a project which falls within Annex II to Council Directive No. 85/337/EEC2on the assessment of the effects of certain public and private projects on the environment but whose characteristics do not require that it should be made subject to an environmental assessment:

And whereas the making of this Order is not opposed:

Now therefore, the Secretary of State, in exercise of the powers conferred on him by section 14 of said Act, (being the appropriate Minister under section 14(7) of that Act for the purpose of making this Order), and of all other powers enabling him in that behalf, on the application of the Mallaig Harbour Authority, and being satisfied that the making of the Order is desirable in the interests of securing the improvement, maintenance or management of the harbour in an efficient and economical manner, hereby makes the following Order

1 PRELIMINARY

PART I

PRELIMINARY

S-1 Citation and commencement

Citation and commencement

1.—(1) This Order may be cited as the Mallaig Harbour Revision Order 1995 and shall come into force on 1st December 1995.

S-2 Interpretation

Interpretation

2.—(1) In this Order, unless the context otherwise requires—

“the Authority” means the Mallaig Harbour Authority;

“the deposited plans and sections” means the plans and sections signed on behalf of the Secretary of State and marked “Plans and sections referred to in the Mallaig Harbour Revision Order 1995” of which copies are deposited at the office of the Secretary of State for Scotland at St Andrew’s House, Edinburgh, EH1 1DG and with the Authority at Harbour Offices, Mallaig, PH41 4QB;

“the level of high water” means the level of mean high-water springs;

“the level of low water” means the level of mean low-water springs;

“the limit of deviation” means the limits of deviation shown on the deposited plans;

“tidal work” means so much of any work as is on, under or over tidal waters or tidal lands below the level of high water;

“the undertaking” means the undertaking of the Authority as from time to time authorised;

“the works” means the works authorised by this Order, or as the case may require, any part thereof and includes any work constructed pursuant to article 6 below.

(2) All situations, points, directions, distances, lengths, dimensions, areas and other measurements stated in this Order shall be construed as if the words “or thereabouts” were inserted after each such situation, point, direction, distance, length, dimension, area or other measurement.

(3) Reference points specified in this Order shall be construed as references to Ordnance Survey National Grid reference points.

(4) Any reference in this Order to a work identified by the number of such work shall be construed as a reference to the work of that number authorised by this Order.

2 WORKS

PART II

WORKS

S-3 Power to construct works

Power to construct works

3. Subject to the provisions of this Order the Authority may in the lines and situations and within the limits of deviation shown on the deposited plans and according to the levels shown on the deposited sections, construct, execute and maintain the works hereinafter described, with all necessary works and conveniences connected therewith, in the parish of Glenelg within the Lochaber district and the Highland Region—

Work No.1

Refacing of the existing marshalling area on its eastern side in reinforced concrete or steel sheet piling with infilling and levelling behind, commencing at a point NM6765897188, 98 metres north-north-east of the northern extremity of the Authority’s office and extending in a north-north-westerly direction for a distance of 30 metres to a point at NM6764997217 and there terminating.

Work No. 2

The construction of a sea wall and the reclamation of the seabed and foreshore behind by infilling, levelling and surfacing an area of irregular shape...