The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022

JurisdictionUK Non-devolved
CitationSI 2022/1396
Year2022

2022 No. 1396

Infrastructure Planning

The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022

Made 7th December 2022

Coming into force 29th December 2022

An application has been made to the Secretary of State under section 37 of the Planning Act 20081(“the 2008 Act”) in accordance with the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 20092for an order granting development consent.

The application has been examined by the Examining Authority appointed by the Secretary of State pursuant to Chapter 3 of Part 6 of the 2008 Act. The examination was carried out in accordance with Chapter 4 of Part 6 of the 2008 Act and the Infrastructure Planning (Examination Procedure) Rules 20103. The Examining Authority has submitted a report and recommendation to the Secretary of State under section 83 of the 2008 Act.

The Secretary of State has considered the report and recommendations of the Examining Authority, has considered the environmental information in accordance with regulation 4 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 20174and has had regard to the documents and matters referred to in section 104(2)5of the 2008 Act.

The Secretary of State, having decided the application, has determined to make an order giving effect to the proposals comprised in the application on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.

Accordingly, the Secretary of State, in exercise of the powers conferred by sections 114, 115, 120 and 149A of the 2008 Act, makes the following Order—

1 PRELIMINARY

PART 1

PRELIMINARY

S-1 Citation and commencement

Citation and commencement

1. This Order may be cited as the Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 and comes into force on 29th December 2022.

S-2 Interpretation

Interpretation

2.—(1) In this Order—

the 1961 Act” means the Land Compensation Act 19616;

the 1965 Act” means the Compulsory Purchase Act 19657;

the 1980 Act” means the Highways Act 19808;

“the 1981 Act” means the Compulsory Purchase (Vesting Declarations) Act 19819;

“the 1990 Act” means the Town and Country Planning Act 199010;

“the 1991 Act” means the New Roads and Street Works Act 199111;

“the 2008 Act” means the Planning Act 200812;

“the 2009 Act” means the Marine and Coastal Access Act 200913;

“access and rights of way plans” means the plans of that name identified in Schedule 12 (documents and plans to be certified) and which are certified by the Secretary of State as the access and rights of way plans for the purposes of this Order;

“address” includes any number or address used for the purposes of electronic transmission; “AOD” means above ordnance datum;

“AGL” means above ground level;

“apparatus” has the same meaning as in Part 3 of the 1991 Act except that it further includes pipelines (and parts of them), aerial markers, cathodic protection test posts, field boundary markers, transformer rectifier kiosks, electricity cables, telecommunications equipment and electricity cabinets;

“application guide” means the document of that name identified in the Schedule 12 (documents and plans to be certified) and which is certified by the Secretary of State as the application guide for the purposes of this Order;

“authorised development” means the development and associated development described in Schedule 1 (authorised development) which is development within the meaning of section 32 of the 2008 Act;

“book of reference” means the document of that name identified in the table in Schedule 12 (documents and plans to be certified) and which is certified by the Secretary of State as the book of reference for the purposes of this Order;

“building” includes any structure or erection or any part of a building, structure or erection;

“canal” means the Stainforth and Keadby Canal;

“Canal and River Trust” means the body of that name which is a company limited by guarantee (company no. 07807276) and a registered charity (charity commission No 146792) whose registered office is at First Floor, North Station House, 550 Elder Gate, Milton Keynes, MK9 1BB;

“carbon capture and compression plant” means the building and associated works comprised in Work No. 1C and Work No. 7 in Schedule 1 shown on the works plans and which are designed to capture, compress and export to the National Grid Carbon Gathering Network, a minimum rate of 90% of the carbon dioxide emissions of the generating station operating at full load;

“carriageway” has the same meaning as in the 1980 Act;

“combined heat and power assessment” means the document of that name identified in Schedule 12 (documents and plans to be certified) and which is certified by the Secretary of State as the combined heat and power assessment for the purposes of this Order;

“commence” means carry out a material operation, as defined in section 155 of the 2008 Act (which explains when development begins) comprised in or for the purposes of the authorised development other than the permitted preliminary works (except where stated to the contrary) and “commencement”, “commenced” and cognate expressions are to be construed accordingly;

“commercial use” means the export of electricity, and of captured compressed carbon dioxide emissions, from the authorised development on a commercial basis, following the completion of commissioning of the authorised development and the first occupation of the authorised development by the undertaker;

“commissioning” means the process of testing all systems and components of the authorised development (including the carbon capture and compression plant and systems and components which are not yet installed but the installation of which is near to completion) in order to verify that they function in accordance with the design objectives, specifications and operational requirements of the undertaker and “commission” and other cognate expressions, in relation to the authorised development are to be construed accordingly;

“compulsory acquisition notice” means a notice served in accordance with section 134 of the 2008 Act;

“construction working site” means a construction site associated with the works including hard standings, lay down and storage areas for materials, equipment, areas for spoil, areas for vehicle parking, areas for welfare facilities including offices, canteen and washroom facilities, workshop facilities temporary fencing or other means of enclosure and areas for other facilities required for construction purposes;

“deemed marine licence” means a licence as set out in Schedule 13 and deemed by article 39 to have been granted under Part 4 of the 2009 Act by virtue of section 149A of the 2008 Act;

“design principles” means the document of that name (being Appendix 1 of the design and access statement) identified in Schedule 12 (documents and plans to be certified) and which is certified by the Secretary of State as the design principles for the purposes of this Order;

“Electricity Act” means the Electricity Act 198914;

“electronic transmission” means a communication transmitted—

(a) by means of an electronic communications network; or

(b) by other means but while in electronic form;

“environmental statement” means the document of that name identified in Schedule 12 and which is certified by the Secretary of State as the environmental statement for the purposes of this Order;

“flood risk assessment” means the document of that name identified in Schedule 12 (documents and plans to be certified) and which is certified by the Secretary of State as the flood risk assessment for the purposes of this Order;

“framework construction environmental management plan” means the document of that name identified in Schedule 12 (documents and plans to be certified) and which is certified by the Secretary of State as the framework construction environmental management plan for the purposes of this Order;

“framework construction traffic management plan” means the document of that name identified in Schedule 12 (documents and plans to be certified) and which is certified by the Secretary of State as the framework construction framework management plan for the purposes of this Order;

“framework construction workers travel plan” means the document of that name identified in Schedule 12 (documents and plans to be certified) and which is certified by the Secretary of State as the framework construction workers travel plan for the purposes of this Order;

“footpath” and “footway” have the same meaning as in the 1980 Act;

“group company” means in relation to the undertaker company, that company and any company which is from time to time a holding company of that company or a subsidiary or subsidiary undertaking of that company or of such holding company;

“haul road plans” means the document of that name identified in Schedule 12 (documents and plans to be certified) and which is certified by the Secretary of State as the haul road plans for the purposes of this Order;

“haul road” means the temporary haul road constructed pursuant to the haul road planning permission (together with such alterations pursuant to Work No. 10a);

“haul road planning permission” means the conditional planning permission with North Lincolnshire Council reference PA/2019/1595, dated 15 November 2019 as varied by planning permission referenced PA/2021/188 dated 1 April 2021, and any other variations thereto (which shall include for the avoidance of doubt any variations pursuant to Section 73 of the 1990 Act);

“highway” and “highway authority” have the same meaning as in the 1980 Act;

“indicative landscape and biodiversity plan” means the document of that name identified in Schedule 12 (documents and plans to be certified) and which is certified by the Secretary of State as the indicative landscaping and biodiversity plan for the purposes of this Order;

“indicative landscaping...